The builder pricing stage is continuing, with input from specialist trades now being sought. The proposed replacement of the floor slab means that all the interior joinery and so forth will need to be removed from the building before that process can begin. The interior fittings are an integral part of Heritage NZ's Category 1 registration of the flats, as they demonstrate Miles Warren's "total design" philiosophy to all aspects of the building's in-and-exterior.