Geotech work inside the flats is now complete. The ground beneath the old floor slab has been excavated and replaced with gravel and a topping of crusher dust.
Wide variations in levels and alignments of walls and beams across the four ground floor flats, some of this due to earthquake movement, but some undoubtedly from the original construction.
Preparation work now underway for installing heating and insulation.