A meeting was held yesterday (Tuesday) between the engineers, architect, re-levelling contractor builder and Arrow to work through some of the issues identified so far in the rebuild plans. These include methodology for the intact removal of the original terrazzo shower bases (pictured), removal and later reinstatement of both the internal and external wooden joinery, and how the re-levelling process and recast concrete floors will affect such things as the internal ground floor sliding doors, fireplace bases and chimney-to-wall junctions, all of which have very fine as-built tolerances. Not an easy project, but clearly a lot of care is going into the detail.
REBUILD UPDATE
A meeting was held yesterday (Tuesday) between the engineers, architect, re-levelling contractor builder and Arrow to work through some of the issues identified so far in the rebuild plans. These include methodology for the intact removal of the original terrazzo shower bases (pictured), removal and later reinstatement of both the internal and external wooden joinery, and how the re-levelling process and recast concrete floors will affect such things as the internal ground floor sliding doors, fireplace bases and chimney-to-wall junctions, all of which have very fine as-built tolerances. Not an easy project, but clearly a lot of care is going into the detail.
0 Comments
Leave a Reply. |
AuthorKeep up to date by joining our Facebook page. Click on the icon above. Archives
January 2021
Categories |